Construction Manager
Employment History
Global Renewable EPC (October 2018 – Present)
Construction Site Manager
- Responsible for supervision Electromechanical assembly of substations, Overhead/underground HV lines
- Supervision of the electrical assembly of the MV/LV part of the solar field and wind farm.
- Electrical, mechanical and civil engineering review.
- Coordination of the different work activities carried out by the different contractors.
- Control of permits and authorisations (plot owners, grid connection, city councils, etc.)
- Control of work progress.
- Control of compliance with quality, prevention and environmental procedures. Land management with landowners
- Management of documentation for project legalisation.
- Documentation management for documentation management network connection.
260MW Wind Farm (February 2022-February 2023)
- 3 substations 132/30KV with 1 trafo and 1 line position
- 1 x 5km 132KV overhead lines and 1 x 20km simplex circuit line. Sections of 3 circuits on the same support
- 1 underground section of 2.1 km. Of 132kV 1000mm² cable 54 Nordex Acciona N155 4.8MW wind turbine concrete towers Medium-voltage network and communications.
250MW Photovoltaic Plant (April 2021 - February 2022) 2 substations 132/30KV with 1 trafo and 1 line position
- 1 substation 132/30KV with 2 transformer and 2 line positions 1 substation 400/132kV with:
- 3 132kV line positions
- 1 position of 132kV transformer 2 400kV line position
- 1 400kV trafo position
- 3 x 5km 132KV overhead lines and 1 x 20km 400kV duplex line
43MW Photovoltaic Plant (July 2020 - April 2021) NCLAVE Trackers and HUAWEI Inverters
- 1 substation 66/30KV with 1 transformer and 1 line position 1 x 3kM 66KV overhead lines
- 8 Transformer Substations
- 3 MV 30kV circuits of 4km each
51MW Wind Farm (Nov 2019- July 2020) Wind farm: 17 Acciona Nordex 3MW Wind Turbines
SET with:
- 2 line positions and 1 transformer position. 132/12kV transformer. 55MVA 132/12kV transformer
- Siemens MV switchgear Type GIS
- LAT 132kV of 980m for connection to existing LAT. 6 MV 12kV circuits of 16km each.
252MW Photovoltaic Plant (Nov 2018- Dec 2019)
Project divided into 6 photovoltaic plants of 42MW (Gonvarri and Convert trackers and Fimer and Santerno inverters).
- 2 substations 220/30KV with 3 trafo positions and 1 line position
- Extension of 400/220kV collector substation with 3 line positions and 2 400KV.
- 2 x 8kM 220KV overhead lines
Industrial Engineering Contractor (October 2011 – October 2018)
Project Manager and Head of HSEQ, Quality and Environment
Technical-economic control of works - Purchasing management - Management of suppliers and personnel. Preparation of budgets - Legalisation of works - Responsible for Management of the Company's Quality System (AENOR ISO9001 - ISO14001 - OHSAS18001 Certification).
- Site manager, automation and medium voltage refurbishment, Arias II hydroelectric power plant - Hidronitro - 2018
- Site Manager Electromechanical Assembly Fervenza II Hydroelectric Power Plant - 3 turbines of 2.9MW and 6/30KV and 30/66kV lifting substations. - Ferroatlántica - 2017/2018
- Works Manager Electromechanical assembly of Novo Castrelo Hydroelectric Power Station - 3 turbines of 2.4MW and 6/66KV lifting substation. - Ferroatlántica. - 2017
- Site technician Electromechanical Assembly of Barro 66kV substation - Unión Fenosa Distribución. - 2017
- Site technician for shielding of 20kV park, Mera 132/20kV substation - Unión Fenosa Distribución. – 2017
- Site manager for Civil Works and Electromechanical Assembly of Los Ausines 220/30kV 27MW. Power transformer 50MVA and 18km of power lines. - PE Los Ausines, S.L. - 2016
- Site manager for the Civil Works and Electromechanical Assembly of the 66/20KV Cordal de Montouto substation. - Gas Natural Fenosa Renovables. - 2015
- 800kVA transformer substation in the Galician Archive building - City of Culture, - 2015
- Works technician Assembly of Sanxenxo 66KV Substation- Unión Fenosa Distribución. -2014
- Installation of Pfisterer T3 Terminations in Sanxenxo substation power transformer - Unión Fenosa Distribución. -2014
- Works technician at the UTE Parnaiba 518MW combined cycle power plant (Brazil). - Initec Energía, S.A. - 2013
- Various works and maintenance in substations, wind farms, hydroelectric power stations and industries.
Global EPC (January 2010 – October 2011)
MV and LV Fault Maintenance Manager. Industrial Technical Engineer
- Technical-economic control of works.
- Repowering of electrical infrastructure of medium and low voltage overhead lines.
- Construction of new overhead (lattice, sheet metal and concrete supports) and underground MV and LV lines
- Construction of new Transformer Substations (250kVA to 630kVA)
Electrical Contractor (January 2008 – December 2009)
Technical-economic control of works - Purchasing management - Management of suppliers and personnel. Preparation of budgets - Legalisation of works.
- 800kVA transformation centre in the Galicia City of Culture Archive building.
- Medium Voltage Electrification (7 Transformer Stations and 5kM MV Line) El Boial Commercial Estate, Ferrol - Santiago Sur.
- Street lighting Polígono Comercial El Boial Ferrol - Santiago Sur. o Minor Works.
Industrial Consultancy (September 2005 – November 2007)
Teaching Consultant
- Experience as a trainer in the following courses (Practical and Theoretical): Truck Crane. Tower Crane. Overhead crane. Mini excavator. Compact Dumper.
- Mobile Elevating Work Platforms (MEWPs). Forklift trucks.
- Scaffolding erection.
- Prevention of Occupational Risks.
- Construction Professional Card (TPC).
Teacher
- Truck Crane Operator (05/06/2010-12/06/2010) Duration:12 hours.
- Mini Excavator Operator (06/06/2009-13/06/2009) Duration: 12 hours.
- Scaffolding assembly (12/05/2009-14/05/2009) Duration: 9 hours.
- Scaffolding assembly (07/02/2009-14/02/2009) Duration: 12 hours.
- Truck Crane Operator (09/06/2009-11/06/2009) Duration: 9 hours.
- Truck Crane Operator (09/05/2009-16/05/2009) Duration: 12 hours.
- Compact Dumper Operator (06/06/2008) Duration: 3 hours.
- Compact Dumper Operator (22/02/2008-01/03/2008). Duration: 25 hours.
- Forklift Operator (12/04/2008- 22/04/2008) Duration: 35 hours.
- Mini Excavator Operator (18/04/2008-26/04/2008) Duration: 25 hours.
- Mini Excavator Operator (01/06/2007-09/06/2007) Duration: 25 hours.
- Mini Excavator Operator (04/05/2007-12/05/2007) Duration: 25 hours.
- Mini Excavator Operator (23/03/2007-14/04/2007) Duration: 25 hours.
- Mini Excavator Operator (09/03/2007-17/03/2007) Duration: 25 hours.
- Compact Dumper Operator (18/05/2007-26/05/2007) Duration: 25 hours.
- Compact Dumper Operator (20/04/2007-28/04/2007) Duration: 25 hours.
- Compact Dumper Operator (02/02/2007-10/02/2007) Duration: 25 hours.
- Compact Dumper Operator (26/01/2007-03/02/2007) Duration: 25 hours.
Authorised Control Body (July 2005-September 2005)
Quality inspector of electrical installations.
Electrical Contractor(March 2004-September 2004)
Administrative.
Industrial Works Contractor (February 2003- August 2003)
Works administrator at the "Caixa Galicia Foundation". (February 2003- August 2003)
Languages
- Galician: Written: Bilingual. Spoken: Bilingual. Translation: Bilingual. Technical: Bilingual.
- Spanish: Written: High. Spoken: High. Translation: High. Technical: High.
- English: Written: High. Spoken: High. Translation: High. Technical: High.
Computer Skills
- Autocad: High level.
- Microsoft Word: High Level
- Microsoft Excel: High Level
- Microsoft Powerpoint: High Level
- Megasyc: High Level
Training/Education:
- Business Management and Administration: Degree in Business Management and Administration (1997-2003).
- Postgraduate studies in auditing and accounting. Postgraduate studies in auditing and accountancy with a total duration of 330 hours at the Ilustre Colegio de Economistas de La Coruña in collaboration with the University of La Coruña (Completion in July 2006).
- Technical Industrial Engineering. Technical Industrial Engineering. Speciality: Electricity. At the University of A Coruña. Spain (2004-2009).
- Advanced Technician in Occupational Risk Prevention (3 Specialities) Triple
- Master's Degree in Occupational Risk Prevention. Three specialities (Safety, Ergonomics and Applied Psychology), Quality and Environment. Duration: 1400 hours (October 2008 - June 2009).
- Graduate in Electrical Engineering. Degree in Electrical Engineering. University of León. Spain (2011).
- Master Commissioning Renewable Energy Plants: University of PISA (2020 - 2021)
- Master Construction Manager: Politecnico di Torino (January 2022 - October 2022)
Work at heights according to RD2177/2004 GWO training:
- Work at Height
- Cargo handling
- Fire extinguishing
- First aid
- Working in Confined Spaces.
- Work with Electrical Risk according to RD614/2001. First aid.
- Fire Fighting.
- Basic Competence Accreditation Unión Fenosa Distribución.